|
PS # -PART-YEAR |
REVISION |
AMENDMENT |
SUBJECT |
STATUS |
|---|---|---|---|---|
| 4137-1-1998 | -- | -- | Industrial - process control systems- Instruments with analogue inputs and two- or multi-state outputs- Part 1: Methods of evaluating the performance. | Active |
| 4138-1998 | -- | -- | Pneumatic instruments driven by associated process gas. Safe installations and operating procedures-Guidelines. | Active |
| 4139-1-1998 | -- | -- | Programmable measuring instruments- Interface system ( byte serial, bit parallel ) - Part 1: Functional, electrical and mechanical specifications, system applications and requirements for the designer and user. | Active |
| 4140-2-1998 | -- | -- | Programmable measuring instruments- Interface system ( byte serial, bit parallel )- Part 2: Codes, formats, protocols and common commands. | Active |
| 4141-1-1998 | -- | -- | Electromagnetic compatibility for industrial-process measurement and control equipment. Part 1: General introduction. | Active |
| 4142-1-1998 | -- | -- | Industrial-process measurement and control. Evaluation of system properties for the purpose of system assessment. Part 1: General considerations and methodology. | Active |
| 4142-2-1998 | -- | -- | Industrial-process measurement and control. Evaluation of system properties for the purpose of system assessment. Part 2: Assessment methodology. | Active |
| 4142-3-1998 | -- | -- | Industrial-process measurement and control. Evaluation of system properties for the purpose of system assessment. Part 3: Assessment of system functionality. | Active |
| 4142-5-1998 | -- | -- | Industrial-process measurement and control. Evaluation of system properties for the purpose of system assessment. Part 5: Assessment of system dependability. | Active |
| 4142-6-2000 | -- | -- | Industrial – process measurement and control - Evaluation of system properties for the purpose of system assessment-Part 6: Assessment of system operability. | Active |
| 4143-1-1998 | -- | -- | Programmable controllers- Part 1: General information. IEC-1131-1/1992 | Active |
| 4143-2-1998 | -- | -- | Programmable controllers. Part 2: Equipment requirements and tests. | Active |
| 4143-3-1998 | -- | -- | Programmable controllers. Part 3: Programming languages. | Active |
| 4143-4-1998 | -- | -- | Programmable controllers. Part 4: User guidelines. | Active |
| 4144-1-1998 | -- | -- | Industrial-process control valves. Part 1: Control valve terminology and general considerations. | Active |
| 4144-2-1998 | -- | -- | Industrial-process control valves. Part 2: Flow capacity: Section one: Sizing equations for incompressible fluid flow under installed conditions. | Active |
| 4144-2-2-1998 | -- | -- | Industrial-process control valves. Part 2: Flow capacity: Section two: Sizing equations for incompressible fluid flow under installed conditions. | Active |
| 4144-2-3-1998 | -- | -- | Industrial-process control valves. Part 2: Flow capacity: Section three: Test procedures. (Replaced PS:2197-2-3-1989). | Replaced PS:2197-2-3-1989 |
| 4144-2-4-1998 | -- | -- | Industrial-process control valves. Part 2: Flow capacity: Section four: Inherent flow characteristics and rangeability. | Active |
| 4144-3-1998 | -- | -- | Industrial-process control valves. Part 3: Dimensions - Section one: Face-to-face dimensions for flanged, two-way, globe-type control valves. | Active |