|
PS # -PART-YEAR |
REVISION |
AMENDMENT |
SUBJECT |
STATUS |
|---|---|---|---|---|
| 709-1980 | -- | -- | Liquid Toilet Soap | Active |
| 710-1975 | -- | -- | Smith Tongs | Active |
| 711-1968 | -- | -- | Sparking plugs (Withdrawn & superceded by PS:1776 to PS:1781) | Withdrawn & superceded by PS:1776 to PS:1781 |
| 712-1968 | -- | -- | Metalclad Switches (withdrawn & superceded by PS:1531) | withdrawn & superceded by PS:1531 |
| 713-1986 | 1st Rev. | -- | Atmospheric conditions for test purposes (1st Revision ) | Active |
| 714-1998 | 4th Rev. | -- | PVC-Insulated Cables (Non-armoured) Electric power and lighting (4th Revision ) | Active |
| 715-1987 | 2nd Rev. | -- | PVC-Insulation and sheath of electric cables (2nd Revision ) | Active |
| 715-C-1978 | 1st Rev. | -- | Colour chart for PVC Insulation and sheath of electric cables (1st Revision ) | Active |
| 716-1993 | -- | -- | Method for mixing and sampling fresh concrete in the laboratory. | Active |
| 717-1984 | -- | -- | Concrete compacting factor test. (withdrawn & superseded by PS 1633-1984) | withdrawn & superseded by PS 1633-1984 |
| 718-1987 | -- | -- | Steel and cast iron-determination of gravimetric method. | Active |
| 719-1987 | -- | -- | Chemical analysis of steels, determi-nation of total carbon. (withdrawn & superseded by PS 1922-1987) | withdrawn & superseded by PS 1922-1987 |
| 720-1991 | -- | -- | Calibration of Brinll Hardness Testing Machine. | Active |
| 721-1968 | -- | -- | Galvanized steel wire for ropes in ship building detains test. (withdrawn) | withdrawn |
| 722-1968 | -- | -- | Galvanized steel wire ropes in ship building. (withdrawn) | withdrawn |
| 723-1968 | -- | -- | Cocunut Oil for Industrial Purpose | Active |
| 724-1967 | -- | -- | Single barrel stirrup pump type sprayers | Active |
| 725-1969 | -- | -- | Copper Sulphate-Test and Visual Exaination of Hot Dip Galvanized and Sheraized Coating Method | Active |
| 726-1996 | -- | -- | Sodium Hydrosulphate | Active |
| 727-1969 | -- | -- | Full Chrome Upper Leather | Active |